Home
Contact Us
Site Map
 
 
 
Search
About Us
Services
Swimming Pools
Swimming Pool Construction  
Frame
Mechanical Equipment
Engine Room
Swimming Pool Types  
Pool Shapes  
Inside Pool Coating  
Magiline Pools
Spa Hot Tub
Pool Covers
Additional Pool Systems
Swimming Pool Accessories
Swimming Pool Chemicals
Spa Hot Tub Chemicals
Swimming Pool Products
Swimming Pools Showcase
Construction Showcase
Spa Products
Downloads Corner
FAQs
Support
 

The water needs to be recycled every 3 - 5 hours, according to regulations. For this reason, it is important to study the construction of the piping in order to ensure the proper handling of the large amount of water, as well as the distance of the pool from the engine room.  This will determine:

  • The sanitation of the pool
  • The cleanliness and clarity of the water
  • The cost of chemicals

By studying the construction of the engine room, we offer you high quality equipment, we guarantee the smooth operation of your pool without problems, and we reduce your cost for maintenance chemicals. This way you can save space and lower the construction cost. It is important to note that you are offered a choice regarding the location of the engine room: it can be underground or above ground, and it can be pre-constructed or build.

Finally, all the engines and equipment that are used by Riviera have a European quality certificate (CE) and are suitable also for pools in which salt water is used.

Dreaming to have your own swimming pool? You are much closer to making it a reality than you think. Just pick up the phone and call us on 77771144 or simply send us an email with your name and number and we will call you back.

print this page email this page go to the top of the page
   
 
 
©2013 Riviera Magi Pools | Disclaimer | Warranty Design & Development by BDigital | Powered by WebStudio